- The company is the leader in its sector in Spain, with the most service stations featuring ultra-fast charging points (at least 150kW). These stations are capable of charging up to 80% of an electric vehicle's battery in just 10 to 20 minutes, depending on the model
- Overall, Moeve operates around 220 ultra-fast charging points that are fully accessible, with another 200 already built and awaiting authorization
- Nowadays, Saturdays at noon experience the highest number of charges across the Moeve network in Spain, with an average charging time of 33 minutes and a power output of 68kW. In Portugal, the peak time is Sunday afternoons, with an average charging time of 34 minutes and a charging power of 57kW
The ultra-fast charging points in the Moeve network (at least 150kW) enable electric vehicles to charge 80% of their battery in just 10 to 20 minutes, depending on the model. The deployment includes charging points along the key road corridors of the Iberian Peninsula, covering five major routes: the Mediterranean Corridor, the Plata Route, the route connecting Portugal and France, as well as the main highways in Portugal.*
Out of the 100 service stations, 70% of them are located in Spanish territory and 30% in Portugal. In total, there are around 220 high power charging points in operation, with at least another 200 built and pending authorization. The entire network is deployed across public locations with free access, where customers can pay by card without the need for registration or an app.
The company announced this milestone during an event held at the Estación de Servicio de Yucatán (Madrid).